200A Panel Upgrade
Full service upgrade to 200 amps, permitted and inspected.
$2,850
typical, standard configuration
Typically 8 hours on site
$2,850
$2,992.50 with the 5% Loclis fee
Full service upgrade to 200 amps, permitted and inspected.
$2,850
typical, standard configuration
Typically 8 hours on site
$2,850
$2,992.50 with the 5% Loclis fee
Replace an undersized or obsolete panel with a modern 200A service. Includes the new panel and breakers, service mast and meter base where required, grounding and bonding brought to current code, permit, utility coordination and final inspection.
If your home still has a Federal Pacific Stab-Lok or Zinsco panel, this isn't an upgrade — it's a safety correction. Those panels have a documented failure-to-trip problem.
Only customers who paid for this service through Loclis and had the order completed can leave one.
5.0
5.0(3)Rated 5.0 out of 5 from 3 verified reviewsEvery review follows a completed Loclis order.
Neil Hargrove
Aug 5, 2026
Quoted before starting, charged what they quoted. Nothing added at the end.
Marcus Delaney
Jul 14, 2026
Straightforward, on time, did what they said. Already booked them again for the fall.
Tanya Brooks
Jul 3, 2026
Showed up in the window they gave me, did the work, sent photos. I don't need more than that.